A technical issue is currently disrupting the intraday flexibility indicator on SMART. Until the problem is resolved, please do not use this data and refer only to the information available on the customer portal.
Maintenance schedule - Super Points 
Point
  • N1 upstream SP (entry)
  • N2 upstream SP (entry)
  • N3 upstream SP (entry)
  • NS1 upstream SP (entry)
  • NS2 upstream SP (entry)
  • NS2 downstream SSP (exit)
  • NS3 upstream SP (entry)
  • NS3 downstream SSP (exit)
  • NS4 upstream SP (entry)
  • EO1 upstream SP (entry)
  • EO2 upstream SP (entry)
  • EO2 downstream SSP (exit)
    No data loaded
    Please activate the fields above